New Water Treatment System & Transformer Refurbishment
- Client: BP Exploration and Fortrum O&M (UK) Ltd
- Date: January 2006 – November 2008
- Value: £1.2million
Project Description
Manufactured, installed and tested a new water treatment system for feeding steam boilers.
All materials were marine grade stainless steel. Involved supplying:
- 2 stainless steel storage tanks each with a capacity of 350 tonnes
- all process pipework, including
- main flow pipework
- chemical injection
- instrumentation
- pumps
- valves
Pipework and support frames were fabricated in our workshops, then tested and installed onsite.