Total – mechanical engineering cover
Client: Total
Location: Shetland Gas Plant

Project:

To provide mechanical engineering cover in the key compressor area of the Shetland Gas Plant during the Christmas/New Year period of 2015. The challenge involved putting together a team capable of working through both important holiday periods at short notice.

Solution:

Total engaged with Ocean Kinetics as they wanted a local company with the accreditation in place who could become familiar in the compressor area in case of future call outs.

Ocean Kinetics responded by having a team in place and on site for a period of 60 days from 1 December. Six of our locally based qualified engineers immediately came on site and quickly got up to speed, causing minimum disruption for the client.

Managerial support to allow responses to client requests over this time was also provided, as was night shift cover, which was mobilised immediately ensuring that cover was in place throughout the holiday period.

Over the cover period we were able to respond to calls on Christmas day, and have Ocean Kinetics’ workshops and facilities open for Total on Boxing Day to allow them to resolve an urgent matter.

Understanding the client’s requirements from the outset was key in delivering this service. Ocean Kinetics had no reportable incidents and all trades provided met and exceeded the client’s standards.

KEY FACTS

Works completed ahead of schedule
60 days on site
Completed with no incidents or injuries
One of Europe's largest oil and gas terminals
“Ocean Kinetics personnel have been very efficient, time keeping has been excellent, very pro-active and overall have delivered an excellent service to us.”
Andrew Wardell, Maintenance and Integrity Superintendent, Total

OTHER CASE STUDIES

Grieg Seafood – salvage fish farm barge

To salvage a 43-metre concrete feed barge, sunk in exposed waters off the coast of Skye

Sullom Voe Terminal – Clair Pig Launching Trolley

To develop a Clair Pig Launching Trolley for Sullom Voe Terminal.

SHEAP Ltd – Lerwick District Heating System Repairs

To work with Team Inc. and Stuart Malcolmson Contractors to deliver one of the most complex work scopes seen to date on SHEAP’s Lerwick district heating system.

For assistance and support please contact:

Graeme Georgeson
graeme.georgeson@oceankinetics.com
T: 01595 697 908

Lewis Grant
lewis.grant@oceankinetics.com
T: 01595 697 913

Logo