To salvage a 43-metre concrete feed barge, sunk in exposed waters off the coast of Skye
To develop a Clair Pig Launching Trolley for Sullom Voe Terminal.
To work with Team Inc. and Stuart Malcolmson Contractors to deliver one of the most complex work scopes seen to date on SHEAP’s Lerwick district heating system.
To fault-find and repair essential emergency equipment on Mellitah Complex - one of the world’s largest gas treatment plants.
To repair and salvage the 28-metre-long Rosebloom fishing vessel after colliding with the Soldian rock.
To dismantle and rebuild a deep-water wharf to accommodate the new polar research vessel, the RRS Sir David Attenborough.
To provide cathodic protection and inspection activities for the shipping port in the Gulf of Aqaba.
To safely deconstruct and recycle the remains of the Buchan Alpha production rig.
To provide mechanical engineering cover in the key compressor area of the Shetland Gas Plant during the Christmas/New Year period of 2015.
To repair the iceberg damage to the quay at the Rothera Research Station for the British Antarctic Survey, in co-operation with Arch Henderson.
To design and install bespoke new fish handling systems for two of the biggest fishing vessels in the Scottish pelagic fishing fleet, Research and Charisma.
To design and install a cathodic protection system to the bearing piles which support Cruise Terminal 2 at the Port of Dover, Europe's busiest ferry port.
To repair and strengthen the Wet Dock Quay, allowing it to service the new Astute class submarines.
To prepare a 10,000-tonne subsea oil storage tank for submersion in the Solan oil field.
To provide tradespeople, technicians and welding services for a major gas plant project.