Grieg Seafood – salvage fish farm barge

To salvage a 43-metre concrete feed barge, sunk in exposed waters off the coast of Skye

Sullom Voe Terminal – Clair Pig Launching Trolley

To develop a Clair Pig Launching Trolley for Sullom Voe Terminal.

SHEAP Ltd – Lerwick District Heating System Repairs

To work with Team Inc. and Stuart Malcolmson Contractors to deliver one of the most complex work scopes seen to date on SHEAP’s Lerwick district heating system.

Mellitah Complex – Repair Emergency Equipment

To fault-find and repair essential emergency equipment on Mellitah Complex - one of the world’s largest gas treatment plants.

Rosebloom – repair and salvage

To repair and salvage the 28-metre-long Rosebloom fishing vessel after colliding with the Soldian rock.

BAM International & British Antarctic Survey- demolish and rebuild deepwater berth

To dismantle and rebuild a deep-water wharf to accommodate the new polar research vessel, the RRS Sir David Attenborough.

Aqaba Container Terminal/BAM International – cathodic protection and inspection

To provide cathodic protection and inspection activities for the shipping port in the Gulf of Aqaba.

Veolia Repsol – recycle Buchan Alpha production rig

To safely deconstruct and recycle the remains of the Buchan Alpha production rig.

Total – mechanical engineering cover

To provide mechanical engineering cover in the key compressor area of the Shetland Gas Plant during the Christmas/New Year period of 2015.

British Antarctic Survey – repair damage to the quay at Research Station

To repair the iceberg damage to the quay at the Rothera Research Station for the British Antarctic Survey, in co-operation with Arch Henderson.

MV Research and MV Charisma

To design and install bespoke new fish handling systems for two of the biggest fishing vessels in the Scottish pelagic fishing fleet, Research and Charisma.

Port of Dover – install cathodic protection system

To design and install a cathodic protection system to the bearing piles which support Cruise Terminal 2 at the Port of Dover, Europe's busiest ferry port.

BAE Systems – repair and strengthen Quay

To repair and strengthen the Wet Dock Quay, allowing it to service the new Astute class submarines.

Premier Oil – subsea oil storage tank

To prepare a 10,000-tonne subsea oil storage tank for submersion in the Solan oil field.

Petrofac – major gas plant project

To provide tradespeople, technicians and welding services for a major gas plant project.