Ocean Kinetics - OCEAN KINETICS SECURE LONDON THAMESPORT CONTRACT
Menu Close

OCEAN KINETICS SECURE LONDON THAMESPORT CONTRACT

June 13, 2019
Ocean Kinetics has recently been awarded a large contract at London Thamesport.

The works involve Design, Supply and installation of a Cathodic Protection system to the 1200 piles that support the quay deck at London Thamesport Isle of Grain. As well as design and installation of a CP system several steel repair jackets will be installed on some of the most severely corroded piles.

Marine Project director, Michael Fox, said, “This will be a challenging contract mainly down to the tidal flow, range of the tide and zero water visibility. Our team will carry out careful planning to ensure the work is completed safely and on time, and we’re looking forward to getting started.”

Docks

RELATED NEWS

OCEAN KINETICS ACHIEVES PE(S)R CERTIFICATION – EXPANDING PRESSURE EQUIPMENT CAPABILITIES

PE(S)R is a key piece of UK legislation governing the conformity of pressure equipment placed on the UK market

OCEAN KINETICS SECURES PRESTIGIOUS FIT 4 OFFSHORE RENEWABLES ‘GRANTED’ STATUS

Ocean Kinetics is pleased to announce that the company has achieved Fit 4 Offshore Renewables (F4OR) ‘granted’ status from the Offshore Renewable Energy (ORE) Catapult.

OCEAN KINETICS OPENS KIRKWALL WORKSHOP

Ocean Kinetics has now moved into its new, expanded workshop facility in Sparrowhawk Road at Hatston Industrial Estate in Orkney.
Logo