Ocean Kinetics - Ocean Kinetics Restores Copeland Lodberry
Menu Close

Ocean Kinetics Restores Copeland Lodberry

March 2, 2021
New life is to be breathed into one of Shetland’s most distinctive and historic built heritage features – the 200-year-old Copeland Lodberry in Lerwick – which is to be renovated and transformed by Ocean Kinetics.

The company purchased the building in November and using traditional and local construction techniques, it will create a new marine training resource here for its staff.

“The Copeland Lodberry is one of the few lodberries left on Lerwick’s seafront,” said Ocean Kinetics managing director John Henderson, “and over the next six months we will be restoring and preserving it so that it will continue to be a wonderful feature of our islands for centuries to come.”

Lodberries, once numerous in Shetland but now rare, were merchants’ dwellings usually from the 17th or 18th centuries which included a house, courtyard, warehouse and pier.

Ocean Kinetics are working with architect Colin Sim from Malcolmson Architects in Scalloway and Karl Tait from Arch Henderson’s on the project, and all the work will be carried out by local craftsmen reusing as much of the original materials as possible.

“The stonework is generally in good repair,” said John Henderson, “but the roof and internal timbers, including windows and doors, are in poor condition and will need extensive work. We will also require new plumbing and electrics.

“The ground floor will be covered in traditional stone flagstones, reusing the old flags wherever possible. The internal layout will be open plan downstairs, including a small meeting area; upstairs will also be open plan with an area for training.

“The courtyard and pier are being repaired, with the deck of the pier being relayed to allow it to be used safely.”

Another significant challenge is flood prevention and this will be provided in a number of ways. Arch Henderson have designed a heavy floor slab and tanking system that will overcome the high tides and storm surges that are predicted over the decades to come. Internal drainage and pump sumps will give additional protection, along with storm gates and shutters fitted to protect windows and doors.

“It’s important for us to maintain the unique character of this building and retain its architectural integrity,” said John Henderson, “so all of these measures will be well concealed and the finished appearance will be outstanding.

“It is a real privilege for us to be restoring this great piece of Shetland history, but even more importantly to be bringing it back to its use as a working building with its focus and purpose linked once again to the sea. That’s very rewarding, and we think the merchants who once traded from here would approve.”

RELATED NEWS

OCEAN KINETICS ANNUAL ‘FUTURES’ SCHOLARSHIP PROGRAMME OPEN FOR APPLICANTS 

Ocean Kinetics has today (31 August 2026) announced that applications are now open for its 2026 ‘Futures’ Scholarship Programme.

OCEAN KINETICS RECOVERS BREACHED FISHING VESSEL

Ocean Kinetics marine department successfully recovered the inshore fishing vessel Firecrest yesterday evening (Wednesday 22 July) from Bain’s Beach in Lerwick.

NEW APPRENTICESHIP OFFERS UNIQUE ROUTE INTO MARINE INDUSTRY

A new in-house apprenticeship is offering ambitious young people the chance to build a career across some of the marine industry's most highly specialised disciplines.
Logo

Lewis Grant

Lewis is our contracts manager and has efficiently outlined processes and project deliverables for many of our large-scale clients, including Total, BAM Nuttal and SSE.

Roger Goudie

Roger is our marine projects manager and looks after our Shetland team. An experienced diver, welder/ fabricator and ROV pilot, Roger has all the skills and experience necessary to drive his team.

Paul Wilson

Paul is our production manager and looks after all fabrication and welding that takes place in-house. He is a highly qualified welder and ensures that all work is completed to the highest standard.

Michael Fox

Michael is our head of marine operations and is based in Aberdeen. He has built up a great working relationship with our UK mainland- based clients and, over the past 20 years, he has led some of our most significant marine projects.

John Henderson

John takes a very hands-on approach to his role as a managing director. He maintains a close relationship with clients by being easily contactable and visiting projects as they happen, both in Shetland and overseas.

Scot Jamieson

Scot is our shop and stores manager, and his extensive knowledge of materials, tools and equipment means he can quickly and effectively find the right solution to a customer’s challenge.

Graeme Georgeson

Graeme is our projects manager for all works carried out on the Sullom Voe Terminal. There’s not a square metre on site that Graeme hasn’t been over at some point in his many years of looking after our activities.

James Isbister

James is one of Ocean Kinetics most experienced engineers, with particular expertise in the fishing/ aquaculture sector. Over the years, he has successfully led many of our fish handing projects.