Menu Close

OCEAN KINETICS SECURE LONDON THAMESPORT CONTRACT

June 13, 2019
Ocean Kinetics has recently been awarded a large contract at London Thamesport.

The works involve Design, Supply and installation of a Cathodic Protection system to the 1200 piles that support the quay deck at London Thamesport Isle of Grain. As well as design and installation of a CP system several steel repair jackets will be installed on some of the most severely corroded piles.

Marine Project director, Michael Fox, said, “This will be a challenging contract mainly down to the tidal flow, range of the tide and zero water visibility. Our team will carry out careful planning to ensure the work is completed safely and on time, and we’re looking forward to getting started.”

Docks

RELATED NEWS

COPELAND LODBERRY RENOVATION PROCESS

Keep up to date with the renovation process of our new training facility, the Copeland Lodberry.

FISH SUCTION CONNECTOR FOR THE F/V GRATEFUL

Ocean Kinetics has recently manufactured and installed a large diameter retractable fish suction connector onboard the modern pelagic trawler F/V Grateful.

ABERDEEN HARBOUR EXPANSION PROJECT OVER HALFWAY COMPLETE

Ocean Kinetics has now successfully delivered and positioned the largest caisson, as part of the Aberdeen Harbour expansion.
Logo